Freeport Logistics Incorporated
431 N 47th Ave, Phoenix, AZ 85043
* Fulfillment - From Internet, E-Mail or Call Centers, Less Than Case Order Picking Of High Volume, Same Day Shipments
* No Long Term Contracts - For Overflow, Start Up or Relocation, No Obligation beyond 30-Days
* Displays - Special Pallets and Floor Displays Built From Your Specifications
* Shrink Wrapping - Heat Tunnel Packaging For the Club Warehouses
* Electronic Invoicing - Generate and Send Electronic Invoices
* Customize Shipping Labels - Such As UPC Labels, Can Be Customized To Comply With the Requirements of Retail Merchandisers
* Assembly - Light Industrial
* Recouping - To Salvage Otherwise Salable Product
* Special Promotions - Distribution Prior and Consolidation Following End of Campaign to Include Re-Boxing, Sorting, and Inventory Management
* Cool Room - Temperature Controlled Space, 65 Degrees Year Round
* Computerized Inventory Control/Locator System - Inventory Is Maintained By Date Code, Lot Numbers, Expiration Date, and FIFO
* All Products Are Located By Building, Aisle, Bay, and Pallet Position
* Record Storage - Includes Same Day Pick Up and Delivery Service
* Equipment - We Offer A Variety Of Attachments For All Industries Including Slip Sheet, Paper And Carton Clamps With Pressure Gauges, Baseloid, Swing-Mast Drexel, Box Car Specials And Heavy Duty 13,000 Pound Capacity Lift
* Rail Served - Our Facilities Are On both the Union Pacific and Burlington Northern Santa Fe Railroads
Reviews
11/30/2017
Provided by YP.comFreeport Logistics is an amazing place to work! The environment is fun, friendly and fast paced! They really go above & beyond to ensure their customers are satisfied.
More Business Info
For Your Warehousing and Logistics Needs, Freeport Logistics, Inc
- Hours
- Regular Hours
Mon - Fri: - Services/Products
- * 1 Exterior Rail Dock with Ramp * 1000 Watt High Bay Metal Halide Fixtures at Truck Dock * 2 Ground Level Ramps * 245,025 Square Foot Building On 14.31 Acres * 28 Kelly 40,000 Pound FX2 Levelers * 30 Foot Clear Ceiling Height * 34 Truck Doors: 28 - 9' X 10', 2 - 20' X 10', 4 - 12' X 14' At Grade Level * 400 Watt High Bay Fixtures in Warehouse * 48' X 48' Bay Spacing * 9 Rail Doors - 10' X 12' * Battery Charging Area * Constructed Of Tilt-Up Concrete * Electrical 277/480 V, 3 Phase Main Switch Board * Rail Served By Burlington Northern Santa Fe * Separate Driver Entrance & Waiting Room * Sky Lights with Safety Cage Security Grills * Slab-On-Grade 6' Thickness 3000 Pound Concrete Over 4' Compacted Base & 12" Engineered Fill * Sprinkler System Diesel Driven Pressure Boosted Pump with ESFR System * Upstairs Warehouse Supervisor Office * Utilities Provided By Salt River Project
- Brands
- packaging, shipping
- Neighborhood
- Estrella
- Other Link
- Other Emails
- Categories
- Logistics, Public & Commercial Warehouses, Shipping Services, Transportation Consultants, Transportation Services, Trucking, Trucking-Motor Freight, Warehouses-Merchandise
Suggest an Edit