Provided by YP.comMy barn project started in February. It was supposed to be a three week project, start to finish. I am now at eight weeks. I have fired Carolina Green Building not only for the extreme delay in time but also for shoddy work.
My barn is 5" out of square and 2" out of level. When they finally began installing the metal on the roof the barn being out of square caused the metal to run crooked with the edge being out on each piece anywhere from 1/2" to 1 1/2". When they installed the first piece of metal on the peak they realized they had ordered the metal too short by 11".
There is a 6 1/2" slope on the concrete from the back door to the front. This means the stall doors and personnel doors wouldn't open all the way. When they began stripping the walls for metal and framing in the windows they measured from the floor up, not from the beams down, so every single board and every window is running downhill at a 6 1/2" slope.